Full range from one supplier
DN32 to DN3000 across concentric, double-eccentric, triple-eccentric, and resilient-seated designs, with wafer, lug, flanged, double-flanged, and grooved connections.
Project-scale distribution
We support EPC contractors, utilities, mining operations, and industrial plant builders with project valve schedules—from 20 valves for an upgrade to 2,000+ for major infrastructure.
Who we support
Water utilities and councils delivering potable-water, wastewater, stormwater, and pump-station works
EPC contractors working through FEED, detailed engineering, procurement, and construction
Mining and minerals-processing operations managing process water, dewatering, and plant utilities
LNG, oil, and gas operators specifying utility, cooling, fire-water, and isolation valves
Power and industrial plant operators planning upgrades, shutdowns, and new-build packages
Data-centre construction and fit-out teams procuring cooling-circuit valves at volume
Project capability
DN32 to DN3000 across concentric, double-eccentric, triple-eccentric, and resilient-seated designs, with wafer, lug, flanged, double-flanged, and grooved connections.
Valve, actuator, and feedback accessories can be supplied as one coordinated assembly, with interfaces and operating requirements reviewed before delivery.
Support for valve type, pressure class, materials, operating conditions, actuator sizing, and project-specific certification requirements.
ISO 9001 manufacturing, ISO 5208 testing, material records, and applicable WRAS, DNV, ATEX, SIL, PED/CE, or fire-safe documentation coordinated to the selected configuration.
One point of contact for package scope, technical clarifications, documentation schedules, manufacturing progress, and delivery planning.
Orders are placed through the authorised TTV distribution channel, supporting manufacturer traceability and consistent project documentation.
Typical project scales
We coordinate valve type, materials, actuation, documentation, and delivery requirements across the complete project schedule.
| Project type | Typical quantity | Common sectors |
|---|---|---|
| Pump-station upgrade | 20–80 | Water, wastewater |
| Treatment-plant fit-out | 80–300 | Water, desalination |
| Industrial-plant construction | 100–500 | Mining, chemical, food |
| Major infrastructure | 500–2,000+ | Water, LNG, power |
| Data-centre cooling fit-out | 500–5,000+ | Technology infrastructure |
How it works
Share the DN range, quantity, media, actuation, and target delivery.
We assess the schedule and identify technical or documentation clarifications.
Materials, pressure class, operation, and applicable approvals are confirmed.
Receive itemised pricing, lead times, and the proposed documentation scope.
The approved package is ordered through TTV and coordinated for delivery.